Skip to content
All services

Kitchen remodels

The room everyone ends up in

Budgets from
Time on site
8 to 12 weeks on site

A kitchen is the hardest room in the house to get right and the one you’ll use the most. We start with how you cook and who’s in the room, then draw it: the layout, the cabinets, where the light falls at six in the evening.

You’ll see the drawings and a fixed price before anyone picks up a hammer. On site, one project lead runs the job from demolition to the last cabinet handle, and you’ll have their number the whole way.

Free estimate
A remodeled kitchen with rift-sawn white oak cabinets, a pale stone counter and handmade off-white tiles, low sun across the counter from a wide window

What's included

  • Measured drawings and a 3D layout before you sign
  • Walls opened, beams sized by our engineer
  • Cabinets, counters, tile and flooring
  • Plumbing, electrical and lighting by licensed trades
  • Permits and every inspection

Good for

  • An older house with a closed-off kitchen
  • A kitchen that works for a family of five
  • Room for an island, at last

Projects

Questions

Can we live in the house while you work?

Most families do. We set up a temporary kitchen with the fridge and a sink, seal off the work with zip walls and clean up at the end of every day.

Do you take out walls?

Often. Our engineer checks what the wall carries and sizes the beam, and the permit covers it.

Ask Halvorsen's helper

Questions about projects, costs, permits and timing

Hi! Ask me what a kitchen or an addition usually costs, how long it takes, which towns we build in or how permits work. To start, call (719) 555-0136 or ask for a free estimate on the contact page.

Accent

Get itGet this template: Joist on WPTom