Permits, without the wait

What needs a permit in most Colorado towns, what the drawings must show, and the three things that send a set back for corrections.

Rolled architectural drawings held flat with a framing square and a tape measure on a worktable, a carpenter's pencil and a coffee mug beside them

Almost everything structural, electrical or plumbing needs a permit: taking out a wall, adding a bathroom, a new window opening, a deck more than thirty inches off the ground. Paint, flooring and cabinets on the same footprint usually don’t.

What the drawings must show

A floor plan before and after, the structure (beam sizes, posts, footings), the energy details (insulation, windows) and, for an addition, a site plan with the setbacks. Our designer draws them; our engineer stamps the structure.

Why sets come back

  1. Missing energy details. The town wants the insulation values on the drawings, not in a note.
  2. No load path. A beam is sized, but nobody shows the post and footing under it.
  3. Setbacks. An addition that’s six inches too close to the line.

Get those right and most kitchen permits here come back in two to three weeks.

Ask Halvorsen's helper

Questions about projects, costs, permits and timing

Hi! Ask me what a kitchen or an addition usually costs, how long it takes, which towns we build in or how permits work. To start, call (719) 555-0136 or ask for a free estimate on the contact page.

Accent

Get itGet this template: Joist on WPTom